JBox Gen 3.0 Assembly Guide

Preperation


Apply the supplied insulating tape to the marked area of the seatpost. Make sure the surface is clean and the tape sits flat without wrinkles.

Electric Tape is mandatory to ensure the correct assembly and clamping.

Install the interface


Position the interface around the seatpost and slide it down until it rests securely in its final position on the frame.

Install the JBox body


Align the JBox body with the interface and slide it into the guide until it is fully seated in the correct position.

Insert and tighten the screw


Insert the mounting screw and tighten it carefully to a torque of 1–1.5 Nm. Do not overtighten.

JBox Gen 2.0 Assembly Guide

Preperation

Mark your seatpost position with 1-2 layers of electrical tape. 
These 1-2 layers will later be used to cover your seatpost after tightening the toolbox. 

Electric Tape is mandatory to ensure the correct assembly and clamping.

Disassemblyof Seatpost

Remove your seatpost completely by pulling it out of the seat tube.

Preperationof Toolbox

Loosen the clamp of the toolbox.

Toolbox assembly

Slide the toolbox onto the seatpost. Mount the toolbox onto the previously applied 1–2 layers of electrical tape.
Tighten the clamp by hand only. Do not exceed 1 Nm of torque.

Assembly of Seatpost

Reinstall the seatpost on your bicycle.
You are done - enjoy the ride.